This week’s construction update

Wailuku Parking Structure:
The HDCC crews continued with work on the entrance structure at Church Street. HDCC subcontractor crews are continuing with the fire sprinkler, lighting, painting and elevator work on the interior of the parking structure.

HDCC crews setting concrete beam and deck forms at the entrance structure
HDCC crews pouring concrete wall
HDCC subcontractor crew painting the interior of the structure
Lite Electric crews setting conduits in electrical room
Elevator crew installing elevator entrance door

Vineyard and Church Street Improvements:
The Mira crews continued with the final setting of sewer and drain manhole covers and water valve boxes in the roadways this week.  Landscaping work on Vineyard Street between Church Street and High Street also commenced this week.

MIRA crews setting drain manhole and water valve covers in roadway
Kihei Landscaping crews commencing with landscaping work on Vineyard Street

General Notices:
Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Vineyard Street between Church and High Street will be closed to thru traffic Monday to Friday between the hours of 8:30 am to 3:30 pm.  

The Wailuku Parking lot is completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway and Wells Park with various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, please click here.