Wailuku Parking Structure:
The HDCC and Maui Kupono crews continued with work on the entrance structure at Church Street. The HDCC and Maui Kupono crews also began preparing the access roadway from Market Street for paving next week.

HDCC crews installing concrete beam forms for concrete ramp to the top floor
IG Steel crews installing steel stairs
D. Leis crews installing fire sprinkler system
Maui Kupono crews working on the entrance structure
Access roadway from Market Street being prepared for paving

Vineyard Street Improvements:
The MIRA crews continued with the concrete sidewalk work for the street this week.

MIRA crews grading for new concrete sidewalks on Vineyard Street
MIRA crews pouring new concrete sidewalks on Vineyard Street

General Notices:
Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Vineyard Street between Church and High Street will be closed to thru traffic Monday to Friday between the hours of 8:30 am to 3:30 pm.  

The Wailuku Parking lot is completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway and Wells Park with various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, please click here.