LATEST UPDATES

This week’s construction update

Wailuku Parking Structure:
The Hawaiian Dredging crews continued with the forming and pouring of concrete walls and columns for the third section of the parking structure this week. The Maui Kupono crews also continued with the preparatory work for the third and fourth sections of the parking structure ground floor concrete slab.

Hawaiian Dredging crews installing concrete formwork
Hawaiian Dredging crews pouring concrete wall
Aerial views of parking structure construction

Vineyard Street Improvements:
The MIRA and Wasa Electric crews continued with the installation of the underground electrical and communication infrastructure and streetlight system infrastructure work this week. Hawaiian Telcom also continued work on the conversion of their existing overhead cabling to underground.

MIRA crews excavating trench for new electrical and communication ductlines
MIRA and Wasa Electric crews installing streetlight system infrastructure
Wasa Electric crews installing electrical and communication ductlines

General Notices:
Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Vineyard Street between Church and High Street will be closed to thru traffic Monday to Friday between the hours of 8:30 am to 3:30 pm.  

The Wailuku Parking lot is completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway and Wells Park with various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, please click here.